One I-90 project down, another up next: Fourth Street ramp reopens; 11th Drive Northeast work underway

One Interstate 90 project is done in Austin, but another is just getting started.

The westbound Interstate 90 off-ramp at the Fourth Street Northwest interchange (Exit 178A) in Austin has reopened following concrete repairs and culvert replacement.

Minnesota Department of Transportation crews repaired concrete at the end of the off-ramp and replaced an adjacent culvert near a bicycle trail on the north side of I-90. With the culvert work, the bicycle trail has also reopened. It had been closed for safety because of a washout area.

Meanwhile, east of the interchange a separate construction project continues. The $2.97 million project to replace the bridge at 11th Drive Northeast is underway. Single-lane traffic in both directions is in effect through this construction zone on I-90.

The bridge is planned to close around June 2, but the ramps should remain open during most of the project.

Bridge demolition is scheduled to be completed between the night of June 2 and the morning of June 5. I-90 traffic that weekend will be routed up the on-ramps and back onto the interstate to avoid the area while the bridge is taken down.

The bridge is scheduled to be completed in early October.

Work will kick into gear on the 11th Drive bridge as it’s ending on the Oakland Place Southeast bridge located on the south end of East Side Lake. That project is expected to end in late May, and the Interstate 90 flyer bridge to Oakland along East Side Lake will open around the same time.

Work on the 11th Drive Northeast bridge will include grading, paving, bridge replacement, and shared use trail and drainage improvements. The new bridge will be widened to accommodate two 12-foot lanes, two 8-foot shoulders and a 10-foot sidewalk. The existing roadway alignment will remain the same.

Some additional one-day closures are planned on 10th Place Northeast and Eighth Avenue Northeast for culvert work through June 1.

MnDOT urges motorists to always be attentive, drive with caution, slow down in work zones and never enter a road blocked with barriers or cones.

For real-time traffic and travel information in Minnesota, visit www.511mn.org or get the free smartphone app at Google Play or the App Store.

Mower County

APS board approves sanctioning boys volleyball

Education

Austin Seniors receive Horatio Alger Scholarships

Crime, Courts & Emergencies

Man sentenced to over eight years for criminal sexual conduct with a child

Grand Meadow

2 injured in Saturday afternoon crash

Mower County

Courtney’s bench: Family and friends honor loved one lost in hope to raise awareness for mental illness

Mower County

Summerset Theatre opens Season 56 with the musical ‘Annie’

Adams

Adams Dairy Days celebrating 50th

Mower County

Gabby Weiss passes away, legacy will continue on the baseball diamond

Mower County

New sculpture is giving visitors another destination stop in Austin

Crime, Courts & Emergencies

Convictions: May 27-June 3

Mower County

In Your Community: Duplicate Bridge

Mower County

In Your Community: Mower County Senior Center

Education

Education Briefs

Education

Pacelli Honor Roll

News

US hiring and wage growth picked up last month in sign of sustained economic health

News

Many Americans are still shying away from EVs despite Biden’s push, an AP-NORC/EPIC poll finds

News

After 41 years, Pat Sajak makes his final spin as host of ‘Wheel of Fortune’

Mower County

Several file for local offices

Agriculture

Minnesota ID‘s first case of avian influenza in a dairy herd

News

D-Day anniversary haunted by dwindling number of veterans and shadowed by Europe’s new war

Mower County

Shawn Tweten steps up to challenge Finstad in primary

News

Well, hello!: ‘Hello, Dolly!’ opens CST’s seventh year

News

Appeals court halts Trump’s Georgia case during appeal of order allowing Willis to stay on case

Mower County

Institute scientist Hilakivi-Clarke receives grant to study possible benefits of organic, pasture-raised beef